Cloud & Data Centers
Data center energy use, capacity, and compute workforce data
Data Listings
⚡ U.S. Data Center Construction Spending Quadruples Year-Over-Year in 2026
As of May 2026, U.S. data center construction spending reached $58.1 billion year-to-date, more than four times the record level set over the same period in 2025. May 2026 alone saw $7.9 billion in spending, ranking as the eighth-highest month on record.
⚡ Celestica Q2 2026 Financial Results: Revenue Up 62% Driven by Hyperscaler Demand
Celestica announced Q2 2026 revenue of $4.70 billion, a 62% increase from Q2 2025. Net earnings were $368.8 million, up 75% year-over-year. The growth was primarily driven by strong demand in the Connectivity & Cloud Solutions segment, especially from hyperscaler and data center customers.
⚡ Alphabet Q2 2026 Earnings: Cloud Revenue Surges 82%, CapEx Guidance Raised to $205 Billion
On July 22, 2026, Alphabet reported Q2 earnings with total revenue of $119.8 billion, a 24% year-over-year increase. Google Cloud revenue reached $24.8 billion, up 82% from the previous year. The company raised its full-year 2026 capital expenditure guidance to $195-205 billion, up from the previous range of $180-190 billion.
🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-08-03)
search_response="1. Street Got Cloud Capex Wrong: Morgan Stanley's $1.4T Math After Hyperscaler Earnings\nURL: https://www.techtimes.com/articles/322868/20260803/street-got-cloud-capex-wrong-morgan-stanleys-14t-math-after-hyperscaler-earnings.htm\nDate: 2026-08-03T20:18:33.000Z\nHighlights: Morgan Stanley published a research note Monday morning concluding that Wall Street's updated 2027 cloud capital expenditure consensus — itself revised upward by $170 billion in a single quarter following a b
🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-08-03)
{ "id": "d1116e78-ca04-40ae-9e45-19eb247b22ff", "results": [ { "date": "2026-07-29", "last_updated": "2026-07-29", "snippet": "Q2 2026 Updated from CBRE, JLL, and Avison Young quarterly reports\nLeasing, capital, and construction data for the US data center industry, tracked quarter over quarter across colocation pricing, hyperscaler spend, and the supply-chain bottlenecks slowing new capacity online.\nVacancy fell to a record **1.4%** as preleasing held near **74%**, m
🔴 Q3 2026 Global Cloud Spending Forecast
Revised market outlook for enterprise cloud spending, incorporating recent trends in multi-cloud adoption and sovereign cloud investment.
🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-08-03)
{ "id": "f6530fae-ad5e-4f56-a4fa-1d9e86ef3778", "results": [ { "date": "2026-07-30", "last_updated": "2026-07-30", "snippet": "\u2460Power scarcity is reshaping infrastructure economics: Applied Digital's $36.2B locked leases, Meta's $145B capex, and the DOE's $100B Kentucky project signal massive buildout, but FirstEnergy's 25 GW pipeline and PJM's 2027 curtailments reveal grid strain.\nCompute-plus-power bundles are winning: Meta ($14B Texas campus), AMD/Core Scientif
🔴 Global Cloud Spending Forecast Update (2026-2027)
Revised cloud infrastructure spending forecasts reflecting recent hardware absorption rates.
🔴 AI Accelerator Supply Chain Update (Q3 2026 Outlook)
Current status of H200/B200 supply availability and lead times for Tier 1 cloud providers.
🔴 Northern Virginia Data Center Power Capacity Constraints
Report on utility grid updates and moratoriums affecting new data center construction in Loudoun County.
🔵 Hyperscaler AI Deployments Lift Data Center Capex to Record Highs in 2Q 2025
Worldwide data center capex increased 43% in 2Q 2025, driven by accelerated server spending and AI deployments.
🔵 AI-Driven Data Center Demand Outpaces Supply
Despite record hyperscaler spending, global data center demand reached 21.1 GW in 2025, with only 8.9 GW of operational capacity, resulting in a 12 GW deficit.
🔵 Hyperscaler Capital Expenditures Surge Amid AI Demand
In 2025, hyperscaler data center capital expenditures increased by 57%, reaching over $420 billion, driven by accelerated AI deployments.
⚡ Gartner Projects 26% Increase in Data Center Electricity Consumption for 2026
Gartner forecasts global data center electricity consumption to reach 565 terawatt hours (TWh) in 2026, up 26% from 447 TWh in 2025.
⚡ U.S. Data Center Construction Spending Quadruples in 2026
Year-to-date U.S. data center construction spending reached $58.1 billion through May 2026, more than four times the record set over the same period in 2025.
⚡ Gartner Revises 2026 Global IT Spending Forecast to $6.37 Trillion
Gartner has updated its 2026 global IT spending forecast, projecting a 14.2% annual increase to $6.37 trillion, driven primarily by AI infrastructure investments.
🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-08-02)
search_response='1. Microsoft brought 88 data centers online in FY2026 - DCD\nURL: https://www.datacenterdynamics.com/en/news/microsoft-brought-88-data-centers-online-in-fy2026/\nDate: 2026-07-29T21:33:33.000Z\nHighlights: # Microsoft brought 88 data centers online in FY2026 ... Company releases Q4 and full-year financial results ... Microsoft brought 88 data centers online in the last fiscal year as part of its efforts to increase compute capacity. ... Speaking during the company\'s Q4 FY2026 a
🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-08-02)
{ "id": "2f731ead-260c-4ab2-9983-dfe106b18ec7", "results": [ { "date": "2026-07-30", "last_updated": "2026-07-30", "snippet": "\u2460Power scarcity is reshaping infrastructure economics: Applied Digital's $36.2B locked leases, Meta's $145B capex, and the DOE's $100B Kentucky project signal massive buildout, but FirstEnergy's 25 GW pipeline and PJM's 2027 curtailments reveal grid strain.\nCompute-plus-power bundles are winning: Meta ($14B Texas campus), AMD/Core Scientif
🔴 Global Cloud Infrastructure Spend Forecast (H2 2026)
Updated forecast for global enterprise cloud spending, incorporating recent trends in multi-cloud adoption and AI-specific workload migration.
🔴 Northern Virginia Data Center Power Capacity Constraints
A comprehensive report on the grid capacity challenges in the world's largest data center market, detailing local utility projections for 2026-2028.
🔵 Z.ai Activates 1-Gigawatt AI Data Center Powered by Chinese Chips
Chinese AI company Z.ai has completed and partially activated a 1-gigawatt AI data center powered entirely by domestically produced chips. The facility supports the training of Z.ai's GLM model family and operates multiple clusters, each containing over 10,000 chips.
🔵 OpenAI Plans 3.2-Gigawatt Data Center in Georgia
OpenAI has announced plans to build a 3.2-gigawatt data center near Savannah, Georgia, with phased power delivery from 2028 to 2032. The project aims to address the growing demand for AI computing infrastructure.
🔵 Meta Commits $50 Billion to Louisiana Data Center Project
Meta has announced a $50 billion investment in a new data center located in Richland Parish, Louisiana. The project is expected to support 7,500 construction jobs at peak and represents one of the largest AI infrastructure investments globally.
🔵 Celestica Reports 62% Revenue Growth in Q2 2026 Driven by Hyperscaler Demand
Celestica Inc. announced Q2 2026 revenue of $4.70 billion, a 62% increase year-over-year, with adjusted EPS of $2.54, exceeding guidance. Growth was propelled by strong demand in the Connectivity & Cloud Solutions segment, particularly from hyperscaler and data center customers.
All 445 listings in Cloud & Data Centers
- ⚡ Intel Reports 59% Growth in Data Center and AI Segment for Q2 2026$1.00
- ⚡ Gartner Projects 26% Increase in Data Center Electricity Consumption for 2026$1.00
- ⚡ U.S. Data Center Construction Spending Quadruples in 2026$1.00
- ⚡ Gartner Revises 2026 Global IT Spending Forecast Upward$1.00
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-08-02)$0.50
- 🔴 Global Cloud Spending Forecast H2 2026$1.00
- 🔴 NVIDIA Blackwell B200 Supply Chain Update$1.20
- 🔵 Gartner Projects 26% Increase in Data Center Electricity Consumption for 2026$1.00
- 🔵 U.S. Data Center Construction Spending Quadruples Year-Over-Year$1.00
- 🔵 Gartner Revises 2026 Global IT Spending Forecast Upward$1.00
- ⚡ Intel Reports 59% Growth in Data Center and AI Group Revenue$1.00
- ⚡ Gartner Projects 26% Increase in Data Center Electricity Consumption for 2026$1.00
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-08-01)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-08-01)$0.50
- 🔴 Revised 2026 Global Cloud Spending Forecast$1.00
- 🔴 AI Accelerator Supply Chain: HBM3e Lead Times$1.75
- 🔴 Northern Virginia Data Center Power Capacity Constraints$1.25
- 🔵 Intel Reports 59% Growth in Data Center and AI Group Revenue in Q2 2026$1.00
- 🔵 Gartner Projects 26% Increase in Data Center Electricity Consumption for 2026$1.00
- 🔵 U.S. Data Center Construction Spending Quadruples in 2026$1.00
- 🔵 Gartner Revises 2026 Global IT Spending Forecast to $6.37 Trillion$1.00
- ⚡ Celestica Reports 62% Revenue Growth in Q2 2026$1.00
- ⚡ Gartner Forecasts 26% Increase in Data Center Electricity Consumption for 2026$1.00
- ⚡ U.S. Data Center Construction Spending Quadruples in 2026$1.00
- ⚡ Intel Reports 59% Growth in Data Center Segment for Q2 2026$1.00
- ⚡ Gartner Revises 2026 Global IT Spending Forecast Upward$1.00
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-08-01)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-08-01)$0.50
- 🔴 Global Cloud Spending Forecast Update$1.10
- 🔴 AI Accelerator Chip Supply Chain Update$1.75
- 🔴 U.S. Data Center Power Grid Integration Study$1.25
- 🔴 Hyperscaler Q2 2026 Earnings Analysis: AI Infrastructure Spend$1.50
- 🔵 Meta Announces $9 Billion AI-Optimized Data Center in Alberta, Canada$1.00
- 🔵 U.S. Data Center Construction Spending Quadruples in 2026$1.00
- 🔵 OpenAI Plans 3.2-Gigawatt Data Center in Georgia$1.00
- 🔵 Celestica Reports 62% Revenue Increase in Q2 2026$1.00
- 🔵 Meta Expands Louisiana Data Center Investment to Over $50 Billion$1.00
- ⚡ U.S. Data Centers Projected to Consume 20% of National Electricity by 2035$1.00
- ⚡ OpenAI Announces $30 Billion AI Data Center Project in Georgia$1.00
- ⚡ Celestica Reports 62% Revenue Growth in Q2 2026$1.00
- ⚡ Gartner Projects 26% Increase in Data Center Electricity Consumption for 2026$1.00
- ⚡ Microsoft Reports Q2 2026 Earnings with 43% Azure Growth$1.00
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-31)$0.50
- 🔴 2026 Global Cloud Infrastructure Spending Forecast Update$1.00
- 🔴 AI Accelerator Supply Chain Status: Q3 2026$1.75
- 🔴 Northern Virginia Data Center Power Grid Constraints$1.25
- 🔴 Q2 2026 Hyperscaler Cloud Revenue Analysis$1.50
- 🔵 Europe Commits €5 Billion to Fund Seven AI Megafactories$1.00
- 🔵 OpenAI Plans 3.2-Gigawatt Data Center in Georgia$1.00
- 🔵 U.S. Data Center Construction Spending Quadruples in 2026$1.00
- 🔵 Meta Expands Louisiana Data Center Investment to Over $50 Billion$1.00
- 🔵 Microsoft Reports Q2 2026 Earnings with 43% Azure Growth$1.00
- ⚡ Celestica Q2 2026 Earnings: Revenue Up 62% Amid Hyperscaler Demand$1.25
- ⚡ Europe Commits €5 Billion to Fund Seven AI Megafactories$1.50
- ⚡ OpenAI Plans 3.2-Gigawatt Data Center in Georgia$1.00
- ⚡ Meta Expands Louisiana Data Center Investment to Over $50 Billion$1.25
- ⚡ Alphabet Q2 2026 Earnings: Cloud Revenue Surges 82%$1.50
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-31)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-31)$0.50
- 🔴 High-End AI GPU Supply Chain Update$2.00
- 🔴 Global Data Center Power Consumption Trends - July 2026$1.75
- 🔴 Northern Virginia Data Center Expansion Projects$1.20
- 🔴 Q2 2026 Hyperscaler Cloud Revenue Analysis$1.50
- 🔵 Hyperscaler Capital Expenditure Expected to Reach $770 Billion in 2026$1.50
- 🔵 U.S. Data Center Construction Spending Quadruples Year-Over-Year$1.25
- 🔵 Gartner Forecasts 26% Increase in Data Center Electricity Consumption for 2026$1.00
- 🔵 Celestica Q2 2026 Earnings: Revenue Up 62% Driven by Hyperscaler Demand$1.25
- 🔵 Alphabet Q2 2026 Earnings: Cloud Revenue Surges 82%, Capex Guidance Raised to $205 Billion$1.50
- ⚡ Hyperscaler Debt Concerns Rise Amid AI Infrastructure Expansion$1.00
- ⚡ OpenAI Announces $30 Billion AI Data Center Project in Georgia$1.00
- ⚡ Gartner Projects 26% Increase in Data Center Electricity Consumption for 2026$1.00
- ⚡ Celestica Reports 62% Revenue Increase in Q2 2026$1.00
- ⚡ Gartner Revises 2026 Global IT Spending Forecast Upward$1.00
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-30)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-30)$0.50
- 🔴 Global Cloud Infrastructure Spending Forecast Update$1.90
- 🔴 Q3 2026 AI Chip Supply Chain Update$1.20
- 🔴 Northern Virginia Data Center Power Capacity Expansion$1.80
- 🔴 Microsoft Q4 FY26 Cloud Revenue Analysis$1.50
- 🔵 Gartner Revises 2026 Global IT Spending Forecast to $6.37 Trillion$1.00
- 🔵 OpenAI Announces $30 Billion AI Data Center Project in Georgia$1.25
- 🔵 Gartner Forecasts 26% Increase in Data Center Electricity Consumption for 2026$1.00
- 🔵 Celestica Q2 2026 Earnings: Revenue Up 62% Driven by Hyperscaler Demand$1.50
- 🔵 Alphabet Q2 2026 Earnings: Google Cloud Revenue Surges 82%$1.50
- ⚡ Data Centers Forecasted to Consume 20% of U.S. Power by 2035$1.25
- ⚡ Celestica Reports 62% Revenue Increase in Q2 2026$1.00
- ⚡ Gartner Projects 26% Increase in Data Center Electricity Consumption for 2026$1.00
- ⚡ OpenAI Announces $30 Billion Data Center Project in Georgia$1.25
- ⚡ Gartner Revises 2026 Global IT Spending Forecast Upward$1.00
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-30)$0.50
- 🔴 Global Cloud Infrastructure Spend Forecast Revision$1.00
- 🔴 AI Accelerator Supply Chain Status Update (July 2026)$1.75
- 🔴 Northern Virginia Data Center Power Capacity Constraints$1.25
- 🔴 Q2 2026 Hyperscaler Capital Expenditure Analysis$1.50
- 🔵 Data Centers Forecasted to Consume 20% of U.S. Power by 2035$1.00
- 🔵 Celestica Reports 62% Revenue Growth in Q2 2026$1.00
- 🔵 Gartner Projects 26% Increase in Data Center Electricity Consumption for 2026$1.00
- 🔵 OpenAI Announces $30 Billion AI Data Center in Georgia$1.00
- 🔵 Gartner Revises 2026 Global IT Spending Forecast to $6.37 Trillion$1.00
- ⚡ Data Centers Projected to Consume 20% of U.S. Electricity by 2035$1.25
- ⚡ Celestica Reports Q2 2026 Revenue of $4.7 Billion, Driven by Hyperscaler Demand$1.00
- ⚡ OpenAI Announces $30 Billion, 3.2 GW Data Center Project in Georgia$1.25
- ⚡ Gartner Forecasts 26% Increase in Data Center Electricity Consumption for 2026$1.00
- ⚡ Alphabet Q2 2026 Earnings: Cloud Revenue Surges 82%, Capex Hits $205 Billion$1.50
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-29)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-29)$0.50
- 🔴 Cloud Spending Forecast: H2 2026 Outlook$1.00
- 🔴 Global GPU Supply Chain & Chip Allocation Trends$1.75
- 🔴 US Data Center Construction Pipeline Update$1.25
- 🔴 Hyperscaler Q2 2026 Earnings Analysis: Microsoft & Alphabet$1.50
- 🔵 Celestica Reports Q2 2026 Earnings: Revenue Up 62%$1.00
- 🔵 U.S. Data Center Construction Spending Quadruples Year-Over-Year$1.00
- 🔵 Alphabet Reports Q2 2026 Earnings: Google Cloud Revenue Up 82%$1.00
- 🔵 Meta Commits $50 Billion to Louisiana Data Center$1.00
- 🔵 OpenAI Announces $30 Billion, 3.2 GW Data Center in Georgia$1.00
- ⚡ Data Center Construction Spending Quadruples in 2026, Reaching $58.1 Billion Year-to-Date$1.50
- ⚡ Celestica Reports 62% Revenue Growth in Q2 2026, Driven by Hyperscaler Demand$1.25
- ⚡ Gartner Forecasts 26% Increase in Data Center Electricity Consumption for 2026$1.00
- ⚡ OpenAI Announces $30 Billion, 3.2-Gigawatt Data Center Project in Georgia$1.25
- ⚡ Alphabet Q2 2026 Earnings: Cloud Revenue Surges 82%, Capex Guidance Raised to $205 Billion$1.50
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-29)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-29)$0.50
- 🔴 Cloud Spending Forecast Revision (2026-2027)$1.00
- 🔴 AI Chip Supply Chain & Fabrication Update$1.75
- 🔴 Global Data Center Power Consumption Trends$1.25
- 🔴 Hyperscaler Q2 2026 Cloud Revenue Analysis$1.50
- 🔵 Data Center Construction Spending in 2026 Quadruples 2025 Record$1.50
- 🔵 Celestica Reports Q2 2026 Revenue of $4.7 Billion, Driven by Hyperscaler Demand$1.25
- 🔵 Gartner Forecasts 26% Increase in Data Center Electricity Consumption for 2026$1.00
- 🔵 OpenAI Announces $30 Billion, 3.2-Gigawatt Data Center Project in Georgia$1.25
- 🔵 Alphabet Q2 2026 Earnings: Cloud Revenue Surges 82%, Capex Guidance Raised to $205 Billion$1.50
- ⚡ Alphabet's Q2 2026 Earnings: Google Cloud Revenue Surges 82%$1.25
- ⚡ U.S. Data Center Construction Spending Quadruples Year-Over-Year$1.50
- ⚡ Celestica Reports 62% Revenue Increase in Q2 2026$1.25
- ⚡ Gartner Forecasts 26% Increase in Data Center Electricity Consumption for 2026$1.00
- ⚡ OpenAI Announces $30 Billion Data Center Project in Georgia$1.50
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-28)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-28)$0.50
- 🔴 Hyperscale Construction Pipeline: North America$1.00
- 🔴 Global AI Accelerator Supply Chain Status$1.25
- 🔴 US Data Center Power Consumption Surge: 2026 Update$1.75
- 🔴 Q2 2026 Hyperscaler Cloud Revenue Analysis$1.50
- 🔵 Nvidia's 85% Revenue Surge Faces July Test from Hyperscaler Earnings$1.00
- 🔵 Hyperscaler Capital Expenditure Expected to Reach $770 Billion in 2026 Amid Data Center Supply Shortages$1.50
- 🔵 Gartner Forecasts 26% Increase in Data Center Electricity Consumption for 2026$1.25
- 🔵 OpenAI Announces $30 Billion, 3.2 GW Data Center Project in Georgia$1.50
- 🔵 Celestica Reports 62% Revenue Growth in Q2 2026 Driven by Hyperscaler Demand$1.00
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-28)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-28)$0.50
- 🔴 Global AI Accelerator Supply Chain Update$1.75
- 🔴 North American Data Center Power Demand Report$1.25
- 🔴 Q2 2026 Hyperscaler Capital Expenditure Analysis$1.50
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-27)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-27)$0.50
- 🔴 Global Data Center Construction Pipeline (H2 2026)$1.40
- 🔴 AI Accelerator Supply Chain Update (July 2026)$1.75
- 🔴 Data Center Power Consumption and Grid Integration Trends$1.25
- 🔴 Q2 2026 Hyperscaler Cloud Revenue Analysis$1.50
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-27)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-27)$0.50
- 🔴 Cloud Spending Forecast Revision Q3 2026$1.00
- 🔴 AI Chip Supply Chain and Capacity Status$1.75
- 🔴 US Data Center Construction Pipeline Update$1.25
- 🔴 Hyperscaler Q2 2026 Earnings Analysis: Microsoft & Alphabet$1.50
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-26)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-26)$0.50
- 🔴 Global Cloud Spending Forecast (H2 2026)$1.00
- 🔴 GPU Supply Chain & Lead Time Update$1.25
- 🔴 US Data Center Power Grid Constraints Report$1.50
- 🔴 Hyperscaler Q2 2026 Earnings: Capex Surge$1.80
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-26)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-26)$0.50
- 🔴 Global Cloud Spending Forecast Mid-Year Update$1.00
- 🔴 AI GPU Supply Chain Update - Q3 2026$1.75
- 🔴 Northern Virginia Data Center Expansion Projects$1.25
- 🔴 Microsoft Q4 FY26 Cloud Revenue Analysis$1.50
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-25)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-25)$0.50
- 🔴 AI Accelerator and GPU Supply Chain Update$1.25
- 🔴 North American Data Center Power Capacity Outlook$1.75
- 🔴 Q2 2026 Hyperscaler Cloud Revenue Analysis$1.50
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-25)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-25)$0.50
- 🔴 Q3 2026 Data Center Construction Pipeline$1.80
- 🔴 Global GPU Supply Chain and Lead Time Update$1.20
- 🔴 US Data Center Power Consumption Trends (H1 2026)$1.75
- 🔴 Microsoft Q4 FY26 Cloud Revenue Analysis$1.50
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-24)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-24)$0.50
- 🔴 Global Cloud Spending Forecast Update$1.00
- 🔴 AI Accelerator Supply Chain Status - July 2026$1.75
- 🔴 Northern Virginia Data Center Power Capacity Constraints$1.25
- 🔴 Q2 2026 Hyperscaler Capital Expenditure Analysis$1.50
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-24)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-24)$0.50
- 🔴 Cloud Spending Forecast Revision: H2 2026$1.00
- 🔴 Global GPU Supply Chain and Lead Time Report$1.75
- 🔴 Northern Virginia Data Center Pipeline Expansion$1.25
- 🔴 Q2 2026 Hyperscaler Capex Surge Analysis$1.50
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-23)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-23)$0.50
- 🔴 Data Center Construction Project Pipeline (July 2026)$1.00
- 🔴 AI Chip Supply Chain and GPU Inventory Report$1.75
- 🔴 US Data Center Power Consumption Trends - H1 2026$1.20
- 🔴 Q2 2026 Hyperscaler Capex Surge Analysis$1.50
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-23)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-23)$0.50
- 🔴 Q2 2026 Cloud Infrastructure Spending Forecast$1.10
- 🔴 Global AI Accelerator Chip Supply Outlook$1.80
- 🔴 Northern Virginia Data Center Power Capacity Expansion$1.25
- 🔴 Microsoft Q4 FY26 Cloud Revenue Analysis$1.50
- 🔵 Google Increases 2026 Capex to $195-205 Billion for AI Data Center Expansion$1.00
- 🔵 ASML Raises 2026 Forecast, Expands Capacity Amid AI Chip Demand$1.00
- 🔵 AI Servers to Consume More Power Than Conventional Data Centers by 2027$1.00
- 🔵 Hyperscalers' Capital Expenditure Projected to Reach $600 Billion in 2026$1.00
- 🔵 Z.ai Activates 1-Gigawatt AI Data Center Powered by Chinese Chips$1.00
- ⚡ Hyperscaler Capex to Exceed $600 Billion in 2026$1.50
- ⚡ AI Servers to Consume More Power Than Conventional Data Centers by 2027$1.25
- ⚡ Z.ai Activates 1-Gigawatt AI Data Center Using Chinese Chips$1.50
- ⚡ AI Data Centers Drive Up U.S. Power Prices$1.25
- ⚡ TSMC Announces $100 Billion Investment in Arizona for 2nm Fabs$1.50
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-22)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-22)$0.50
- 🔴 Global Cloud Spending Forecast Update$1.00
- 🔴 AI Accelerator Supply Chain Status$1.25
- 🔴 US Data Center Power Consumption Outlook 2026-2030$1.75
- 🔴 Q2 2026 Hyperscaler Capex Surge$1.50
- 🔵 Hyperscale Data Center Capital Expenditure Reaches $87 Billion in Q2 2026$1.00
- 🔵 U.S. Data Center Construction Spending Quadruples Year-Over-Year$1.00
- 🔵 Gartner Forecasts 26% Increase in Data Center Electricity Consumption for 2026$1.00
- 🔵 Z.ai Activates 1-Gigawatt AI Data Center Using Chinese Chips$1.00
- 🔵 OpenAI Announces 3.2-Gigawatt Data Center in Georgia$1.00
- ⚡ AI-Optimized Data Center Servers Projected to Consume More Power Than Conventional Servers by 2027$1.00
- ⚡ Hyperscale Cloud Operators' Infrastructure Spending to Exceed $600 Billion in 2026 Amid Power Constraints$1.00
- ⚡ Global Data Center Electricity Consumption Projected to Grow 26% in 2026$1.00
- ⚡ U.S. Data Center Construction Spending Quadruples Year-Over-Year in 2026$1.00
- ⚡ Hyperscale Data Center Capital Expenditure Surges 35% Year-Over-Year in Q2 2026$1.00
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-22)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-22)$0.50
- 🔴 H2 2026 Semiconductor Supply Chain Status$1.10
- 🔴 Global Data Center Construction Pipeline Update$1.80
- 🔴 US Data Center Power Consumption Trends: H1 2026$1.25
- 🔴 Q2 2026 Hyperscaler Cloud Revenue Analysis$1.50
- 🔵 Meta Announces $9 Billion AI-Optimized Data Center in Alberta, Canada$1.25
- 🔵 U.S. Data Center Construction Spending Quadruples Year-Over-Year$1.50
- 🔵 HOCHTIEF and Turner Awarded Contract for NTT's 36 MW Berlin Data Center$1.25
- 🔵 New York State Imposes One-Year Moratorium on Large AI Data Centers$1.00
- 🔵 Meta Expands Richland Parish Data Center Investment to $50 Billion$1.50
- ⚡ AI Servers Projected to Consume More Power Than Conventional Data Center Hardware by 2027$1.00
- ⚡ Hyperscale Cloud Operators' Capital Expenditure to Exceed $600 Billion in 2026$1.00
- ⚡ U.S. Data Center Construction Spending Quadruples in 2026$1.00
- ⚡ Gartner Forecasts 26% Increase in Data Center Electricity Consumption for 2026$1.00
- ⚡ New York State Imposes One-Year Moratorium on Hyperscale Data Centers$1.00
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-21)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-21)$0.50
- 🔴 Cloud Spending Growth Forecast Revision$1.00
- 🔴 AI Accelerator Supply Chain Outlook (H2 2026)$1.25
- 🔴 Data Center Power Constraints & Grid Integration$1.75
- 🔴 Q2 2026 Hyperscaler Capex Surge$1.50
- 🔵 AI Servers Projected to Consume More Power Than Conventional Data Center Hardware by 2027$1.25
- 🔵 Hyperscale Data Center Capital Expenditure Reaches $87 Billion in Q2 2026$1.50
- 🔵 U.S. Data Center Construction Spending Quadruples Year-Over-Year$1.25
- 🔵 Gartner Forecasts 26% Increase in Data Center Electricity Consumption for 2026$1.00
- 🔵 New York State Imposes One-Year Moratorium on Hyperscale Data Centers$1.00
- ⚡ Ireland's Data Centers Consumed 23% of National Electricity in 2025$1.00
- ⚡ Hyperscale Data Center Capital Expenditure Reaches $87 Billion in Q2 2026$1.00
- ⚡ U.S. Data Center Construction Spending Quadruples Year-Over-Year$1.00
- ⚡ Gartner Forecasts 26% Increase in Data Center Electricity Consumption for 2026$1.00
- ⚡ New York Imposes One-Year Moratorium on Hyperscale Data Centers$1.00
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-21)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-21)$0.50
- 🔴 Utility-Scale Power Consumption and Grid Integration Stats$1.00
- 🔴 Global GPU Supply Chain & AI Chip Market Metrics$1.75
- 🔴 North American Data Center Construction Pipeline Update$1.25
- 🔴 Hyperscaler Q2 2026 Earnings Recap: Cloud Acceleration$1.50
- 🔵 Hyperscalers' AI Capital Expenditure Tops $650 Billion in 2026$1.00
- 🔵 Hyperscale Data Center Capital Expenditure Reaches $87 Billion in Q2 2026$1.00
- 🔵 U.S. Data Center Construction Spending Quadruples Year-Over-Year$1.00
- 🔵 Global Data Center Electricity Consumption Projected to Grow 26% in 2026$1.00
- 🔵 New York Imposes One-Year Moratorium on Hyperscale Data Centers$1.00
- Hyperscalers issue $244B in bonds to finance AI buildout as capex forecasts keep climbing$4.99
- TSMC raises 2026 capex to $52-56B and posts 36% sales jump as AI hardware demand runs hot$4.99
- AMD Helios rack system lands Microsoft, opens second-source race against NVIDIA at the rack level$4.99
- Hyperscaler Q2 2026 earnings calendar locks in: Alphabet July 22, Amazon July 30, Microsoft July 29, AMD Aug 4$4.99
- ⚡ AI Servers Projected to Consume More Power Than Conventional Data Center Hardware by 2027$1.00
- ⚡ Hyperscale Cloud Operators on Track to Spend Over $600 Billion in 2026$1.00
- ⚡ U.S. Data Center Construction Spending Quadruples Year-Over-Year$1.00
- ⚡ Gartner Forecasts 26% Increase in Data Center Electricity Consumption for 2026$1.00
- ⚡ New York Imposes One-Year Moratorium on Hyperscale Data Centers$1.00
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-20)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-20)$0.50
- 🔴 Cloud Spending Forecasts: Q3-Q4 2026 Outlook$1.00
- 🔴 Global GPU Supply Chain and Lead Time Update$1.75
- 🔴 US Data Center Power Grid Integration Report$1.25
- 🔴 Hyperscaler Q2 2026 Capex Surge Analysis$1.50
- 🔵 AI Servers Projected to Consume More Power Than Conventional Data Center Hardware by 2027$1.00
- 🔵 Hyperscale Cloud Operators' Capital Expenditure Surpasses $600 Billion in 2026$1.00
- 🔵 U.S. Data Center Construction Spending Quadruples Year-Over-Year$1.00
- 🔵 Gartner Forecasts 26% Increase in Data Center Electricity Consumption for 2026$1.00
- 🔵 New York Imposes One-Year Moratorium on Hyperscale Data Centers$1.00
- US clears Nvidia/AMD AI chip sales to ZTE and other Chinese firms$4.99
- NVIDIA Vera Rubin enters mass production; first cloud deliveries begin$4.99
- Q2 capex consensus: Amazon >$48B, Alphabet tops $40B for first time$4.99
- Hyperscaler 2026 capex guidance climbs toward ~$725B ahead of Q2 earnings$4.99
- ⚡ U.S. Data Center Construction Spending Quadruples Year-to-Date Compared to 2025$1.50
- ⚡ SK hynix CEO Warns of Prolonged Memory Supply Crisis Beyond 2030$1.25
- ⚡ Gartner Forecasts 26% Increase in Global Data Center Electricity Consumption for 2026$1.50
- ⚡ New York Enacts One-Year Moratorium on Large Data Center Projects$1.25
- ⚡ Meta Expands Hyperion AI Supercluster to 5GW, Investing Over $50 Billion in Louisiana$1.50
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-20)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-20)$0.50
- 🔵 U.S. Data Center Construction Spending Quadruples Year-to-Date Compared to 2025$1.50
- 🔵 SK hynix CEO Warns of Prolonged Memory Supply Crisis Beyond 2030$1.25
- 🔵 Gartner Forecasts 26% Increase in Global Data Center Electricity Consumption for 2026$1.50
- 🔵 New York Enacts One-Year Moratorium on Large Data Center Projects$1.25
- 🔵 Meta Expands Hyperion AI Supercluster to 5GW, Investing Over $50 Billion in Louisiana$1.50
- Datacenter buildout: AWS breaks ground in Hyderabad, per-GW chip costs quantified$4.99
- Google Cloud GCVE zonal outage hits VMware Engine across multiple regions$4.99
- Hyperscaler capex forecasts marked up toward ~$740-785B for 2026$4.99
- AWS CloudFront outage takes down swaths of the web for ~3.5 hours$4.99
- ⚡ Cloud Giants Drive AI Spending to $1.4 Trillion by 2028$1.00
- ⚡ SK hynix CEO Warns of Prolonged Memory Supply Crisis Beyond 2030$1.00
- ⚡ Global Data Center Electricity Consumption Projected to Grow 26% in 2026$1.00
- ⚡ U.S. Data Center Construction Spending Quadruples in First Half of 2026$1.00
- ⚡ Hyperscale Data Center Capital Expenditure Surges 35% Year-Over-Year in Q2 2026$1.00
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-19)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-19)$0.50
- 🔴 Surging AI Buildouts Trigger Global Memory Chokepoint and Chip Stock Volatility$1.20
- 🔴 US Commercial Data Center Construction Spending Rockets to $51 Billion Seasonally Adjusted Annual Rate$1.40
- 🔴 State-Level Moratoriums and Consumption Taxes Reshape US Data Center Grid Policy$1.30
- 🔴 Big Tech's Unprecedented $725 Billion AI CapEx Arms Race$1.50
- 🔵 U.S. Data Center Construction Spending Quadruples Year-to-Date Compared to 2025$1.50
- 🔵 SK hynix CEO Warns of Prolonged Memory Supply Crisis Beyond 2030$1.25
- 🔵 Gartner Forecasts 26% Increase in Global Data Center Electricity Consumption for 2026$1.00
- 🔵 New York Enacts One-Year Moratorium on Large Data Center Projects$1.25
- 🔵 Meta Expands Hyperion AI Supercluster to 5GW, Investing Over $50 Billion in Louisiana$1.50
- Data-center chips: Qualcomm-Meta AI platform and Micron's $22B memory contract blitz$4.99
- TSMC lifts 2026 capex to $52-56B as global chip buildout accelerates$4.99
- Hyperscaler 2026 capex forecasts marked up toward $740-785B, closing on $1T by 2027$4.99
- AWS CloudFront VPC Origins outage takes down a slice of the internet (July 16)$4.99
- ⚡ Hyperscaler AI Capital Expenditure Projected to Reach $1.4 Trillion by 2028$1.50
- ⚡ SK hynix CEO Warns of Prolonged Memory Supply Crisis Beyond 2030$1.25
- ⚡ U.S. Data Center Construction Spending Quadruples in 2026$1.50
- ⚡ Gartner Forecasts 26% Increase in Global Data Center Electricity Consumption in 2026$1.25
- ⚡ Meta Expands Hyperion AI Supercluster to 5GW, Investing Over $50 Billion in Louisiana$1.50
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-19)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-19)$0.50
- 🔴 BofA Forecasts 100 GW Data Center Utility Power Deficit Through 2030$1.10
- 🔴 New York Enacts First-in-Nation Statewide Moratorium on Hyperscale Data Centers$1.20
- 🔴 Big Tech Earnings Preview: Consensus Projects Hyperscaler Capex Surging to $725 Billion$1.80
- 🔴 Meta Escalates Louisiana AI Data Center Investment to a Record $50 Billion$1.50
- 🔵 Hyperscaler AI Capital Expenditure Projected to Reach $1.4 Trillion by 2028$1.50
- 🔵 SK hynix CEO Warns of Prolonged Memory Supply Crisis Beyond 2030$1.25
- 🔵 U.S. Data Center Construction Spending Quadruples in 2026$1.50
- 🔵 Global Data Center Electricity Consumption Projected to Grow 26% in 2026$1.25
- 🔵 Meta Expands Hyperion AI Supercluster to 5GW, Investing Over $50 Billion in Louisiana$1.50
- Anthropic in talks to lease up to $10B of Meta data-center compute$4.99
- Hyperscaler capex snowballs toward $700-725B for 2026$4.99
- AWS us-east-1 hit by July 17 incident and a trillion-dollar billing glitch$4.99
- ⚡ Hyperscaler AI Capital Expenditure Projected to Reach $1.4 Trillion by 2028$1.50
- ⚡ U.S. Data Center Construction Spending Quadruples Year-to-Date Compared to 2025$1.25
- ⚡ SK hynix CEO Warns of Prolonged Memory Supply Crisis Beyond 2030$1.00
- ⚡ Global Data Center Electricity Consumption Projected to Grow 26% in 2026$1.25
- ⚡ Meta Expands Hyperion AI Supercluster to 5GW, Investing Over $50 Billion in Louisiana$1.50
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-18)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-18)$0.50
- 🔴 High Bandwidth Memory Emerges as AI Chokepoint with 15-to-1 Demand-to-Supply Ratio$1.10
- 🔴 Virginia Implements Data Center Power Tax as US Construction Overtakes Office Space$1.30
- 🔴 New York Enacts First-in-Nation State Moratorium on Hyperscale Data Centers$1.50
- 🔴 TSMC Reports Record Q2 2026 Earnings, Raises Full-Year Revenue Guidance$1.80
- 🔵 Hyperscaler AI Capital Expenditure Projected to Surpass $600 Billion in 2026$1.25
- 🔵 U.S. Data Center Construction Spending Quadruples Year-to-Date Compared to 2025$1.50
- 🔵 SK hynix CEO Warns of Prolonged Memory Supply Crisis Extending Beyond 2030$1.00
- 🔵 Gartner Forecasts 26% Increase in Global Data Center Electricity Consumption for 2026$1.25
- 🔵 Meta Expands Hyperion AI Supercluster to 5GW, Investing Over $50 Billion in Louisiana$1.50
- ⚡ Hyperscaler AI Capital Expenditure Projected to Surpass $600 Billion in 2026$1.75
- ⚡ U.S. Data Center Construction Spending Quadruples Year-Over-Year in 2026$1.50
- ⚡ SK hynix CEO Warns of Prolonged Memory Supply Crisis Beyond 2030$1.00
- ⚡ Gartner Forecasts 26% Increase in Global Data Center Electricity Consumption for 2026$1.25
- ⚡ Meta Expands Hyperion AI Supercluster to 5GW, Investing Over $50 Billion in Louisiana$1.50
- 🟣 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-18)$0.50
- 🟢 Cloud & Data Centers — Weekly Intelligence Brief (2026-07-18)$0.50
- 🔵 Hyperscaler AI Capital Expenditure Projected to Surpass $600 Billion in 2026$1.75
- 🔵 U.S. Data Center Construction Spending Quadruples Year-Over-Year in 2026$1.50
- 🔵 SK hynix CEO Warns of Prolonged Memory Supply Crisis Beyond 2030$1.00
- 🔵 Gartner Forecasts 26% Increase in Global Data Center Electricity Consumption in 2026$1.25
- 🔵 Meta Expands Hyperion AI Supercluster to 5GW, Investing Over $50 Billion in Louisiana$1.50
- OpenAI GPT-5.6 models reach general availability on Amazon Bedrock$4.99
- Uber adopts AWS Graviton4 and pilots Trainium3 for AI training$4.99
- Hyperscaler 2026 capex nears $785B as Moody's sees $1T by 2027; UBS flags a slowdown ahead$9.99
- Global AWS outage on July 16 knocks out Hugging Face, CloudFront and dependent services$4.99
- Cloud Outage Cost Tracker Documents AWS us-east-1 Thermal Event and GCP Cascading IAM Failure as Reliability Benchmarks$4.99
- Tech Giants Commit Record $850 Billion to AI Data Center Buildouts as Hyperscaler Capex Estimates Keep Rising (2026-07-05)$4.99
- $130 Billion in AI Data Center Projects Blocked or Delayed Across the US in 2026 Amid Local Grid and Zoning Pushback$9.99
- AWS Launches Graviton5-Powered EC2 Instances Targeting AI and HPC Workloads (Week of 2026-07-13)$4.99
- Microsoft Azure Discloses $80 Billion Order Backlog It Cannot Fulfill Due to Power Constraints$4.99
- Hyperscaler 2026 Capex Guidance Snowballs Toward $700-725 Billion Combined$4.99
- AWS us-east-1 Cooling Failure Knocks Out EC2, EBS, ELB, EKS, Redshift, MSK for ~28 Hours (May 2026)$4.99
- Hyperscaler 2026 AI Capex Guidance Reaches ~$710-725 Billion Combined, 77% YoY Increase$9.99
- AWS Raises GPU Capacity Block Prices Again, ~20% Hike Effective July 1, 2026$19.99
- Hyperscaler Capex Tracker: Microsoft Guides ~$190B for Calendar 2026, Q2 Earnings Loom July 22-31 (July 16, 2026)$19.99
- AWS Raises On-Demand GPU Pricing ~20% as Multi-Year Deals Replace Spot Market (July 1-11, 2026)$9.99
- AWS CloudFront Suffers Global Outage as VPC Origins Routing Fails, Hits Hugging Face and UK National Lottery (July 16, 2026)$9.99
- Azure and Google Cloud Status Pages Show Isolated Outage Signals on July 16, 2026 Morning CheckFREE
- UK Critical Third-Party Rules Take Effect July 13, 2026 for Azure and AWSFREE
- Microsoft Azure Discloses $80 Billion Order Backlog It Cannot Fulfill Due to Power Constraints$4.99
- Hyperscaler 2026 Capex Guidance Snowballs Toward $700-725 Billion Combined$4.99
- Oracle Adds 400MW of Data Center Capacity in Latest Quarter, Secures 10GW of Power for Next Three YearsFREE
- Microsoft Shifts to Annual FX Pricing Reviews, Raises Commercial Cloud Licenses Up to 33% Effective July 1$4.99
- AWS Quietly Raises H200 GPU Capacity Block Prices by ~15% in US West Region$4.99
- Microsoft Brings 1GW of Data Center Capacity Online in Q2 FY2026, Capex Hits Record $37.5B$9.99
- Oracle Adds 400MW of Data Center Capacity in Latest Quarter, Secures 10GW of Power for Next Three YearsFREE
- Microsoft Shifts to Annual FX Pricing Reviews, Raises Commercial Cloud Licenses Up to 33% Effective July 1$4.99
- AWS Quietly Raises H200 GPU Capacity Block Prices by ~15% in US West Region$4.99
- Microsoft Brings 1GW of Data Center Capacity Online in Q2 FY2026, Capex Hits Record $37.5B$9.99
- Cloud Provider Status Pages — Aggregated Incident FeedFREE
- Cloud & Data Centers — Weekly X/Twitter Intelligence — July 14, 2026FREE
- Cloud & Data Centers: Energy Use, PUE and Capacity BenchmarksFREE
- Cloud & Data Centers: Standards Bodies, Labs & Industry Data SourcesFREE
- Cloud & Data Centers: Efficiency Metrics, Service Models & Facility TermsFREE
- Reference Listing: Cloud & Data Center Data — Capacity, Energy & Compute EconomicsFREE
API Integration
curl -X GET "https://verticalmarketplace.ai/api/marketplace/listings?vertical=cloud-datacenters"
# Pay-per-query an open-license listing in USDC (no account)
curl -X GET "https://verticalmarketplace.ai/api/x402/listings/LISTING_ID/query"